Welcome to the web site of the LHC Collimation Upgrade Specification Meeting.

Mandate:

Study beam dynamics and operational aspects of new collimation schemes in the dispersion suppressors of the insertion regions of the LHC, for upgrade scenarios beyond LS1.
Identify open issues and assign priorities to the work required and provide the necessary inputs to the team involved, including external collaborators.

Latest developments

New updates to the halo simulations page: fast dump failures, 4 TeV quench test with updated carbon density, DS collimators.

WP5/HiLumi page: added D5.4, D5.5 and MS51.

List of deliverables and milestones of WP11 added to EuCARD2 page.

All images should be clickable now. Send us an email if you find a bug or a dead link!

Latest events:

88sdSpecial ColUSM: Material and design readiness for LS2 productions (02/05/2017) indico page minutes

S.Redaelli Global plan, baseline for LS2, milestones from prototypes and MDs
B.Salvant Introduction and impedance motivation pdf
O.Aberle Planned production timeline and milestones pdf
A.Bertarelli Status of MoGR (and CuCD) development pdf
F.Carra New TCSPM design - compatibility with HL loss scenarios pdf
F.Carra New TCSPM design - outcome of HRM pdf
I.Lamas New STI tests HRM and plans for 2017 pdf
C.Accettura Status and plan for vacuum validation pdf
L.Gentini Design options for RF aspects pdf

87sdColUSM Meeting (21/04/2017) indico page minutes

A.Santamaria Impacts on collimator for CC failures pdf
J.Wagner Preparation of US-LARP meeting pdf
G.Valentino Plans for HiRadMat tests with SLAC Rotating Collimators pdf

86sdColUSM Meeting (07/04/2017) indico page minutes

F.Forcher Updated crystal routine - implementation and benchmark pdf
R.Rossi Updated crystal routine - improved LHC simulation results pdf

85sdColUSM Meeting (24/03/2017) indico page minutes

A.Bertarelli Outcome of EuCARD-WP11 annual meeting pdf
G.Gobbi Loads on new secondary collimators (TCSPM) for HL-LHC pdf
J.Wagner Status of hollow e-lens simulations pdf

84sdColUSM Meeting (17/03/2017) indico page minutes

D.Perini Status and news on cathode development pdf
G.Stancari Characterization of the CERN hollow electron gun at the Fermilab electron-lens test stand pdf
M.Fitterer Collimation with wires for halo control - preliminary results pdf